Under Construction,Delaying,and Bacon Strips :D

Status
Not open for further replies.
I can give you one for these two:

Kurt's Entei
NN Novastorm


Timid
OT: Kurt
ID 56569
IV 31/3/31/31/30/31 Grass HP
EV: 6/0/0/252/0/252
AR Cloned by me



Kurt's Raikou


Timid
OT: Kurt
ID 56569
IV 31/3/31/31/30/31 Grass HP
EV: 6/0/0/252/0/252
AR Cloned by me
 
CMT for

Espeon

Ability:Magic Bounce
Nature: Modest
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me

Leafeon

Ability: Chlorophyll
Nature: Jolly
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me

Ifly's Dream World Ability Gligar (-> Poison Heal Gliscor!) lv 10 UT

Nature: Careful | Ability: Immunity
31 | 31 | 31 | 31 | 31 | 31 [Dark 70]
Moves: Poison Sting / Rain Dance / U-turn / Night Slash
OT: Keith [23718] | Hatch Date: April 27, 2011 | Hatched: Skyarrow Bridge
NFT
 
CMT For EV'd


31/30/31/31/31/0
Reuniclus @ Leftovers/Life Orb
Modest Nature
Magic Guard Ability
Egg Moves:
-Calm Mind
-Psychic
Trained Moveset:
-Recover
-Calm Mind
-Psychic
-Focus Blast

Available UT @ lvl.1 or EV Trained @ lvl.41
EVs: 252 HP/ 252 DEF/ 6 SP.DEF
Cloned Via: Action Replay
 
I hate it to get CMTs,and not being responsive.this is smogon,is it not?

However,removal of Bold Bulbasaur,i think i was high when i posted it ><
 
CMT for...


Male Lv.100
Adamant Mold Breaker
Shiny
Held Item: Life Orb
OT:Jim ID:42521
IVs:31/31/31/30/24/31
EV's:252 ATK/ 4 DEF/ 252 Speed
Moveset:Dragon Dance, Dragon Claw, Earthquake, DragonTail
AR Cloned by me


Ability:Magic Bounce
Nature: Mild/Modest/Timid
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me


Male Lv.100
Adamant Shell Armor
Shiny
Held Item: Leftovers
OT: Jim ID: 42521
IVs: 31/31/31/24/31/31
EVs: 248 hp/ 24 atk/ 236 SpD
Moveset: Swords Dance, Megahorn, Iron Head, Pursuit
AR Cloned by me



Male Lv.100
Adamant Swarm
Shiny
Held Item: Life Orb
OT:Jim ID:42521
IVs: 31/31/31/30/24/31
EVs:6 HP/ 252 ATK/ 252 Speed
Moveset: Swords Dance, Megahorn, Earthquake, Stone Edge
AR Cloned by me



Male Lv.100
Timid Compound Eyes
Shiny
Held Item:Life Orb
OT:Jim ID:42521
IVs:31/31/30/30/31/30
EVs: 6HP/ 252 Spa/ 252 Speed
Moveset: Thunder, Big Buzz, Volt switch, HPFire 70
AR Cloned by me



Male Lv.100
Hasty Sticky Hold
Shiny
Held Item: Focus Sash
OT:Jim ID:42521
IVs: 31/31/31/31/30/31
EVs: 6HP/126ATK/126SpA/252 Speed
Moveset: Yawn, Spikes, Protect, U-Turn
AR Cloned by me
 
Mat's Shiny Minccino

OT:Mat
ID: 30160
IV: 31 / 31 / 31 / 31 / 31 / 31

Mat's Shiny Pidove

OT:Mat
ID: 30160
IV: 31 / 31 / 31 / 31 / 31 / 31
 
CMT

Fenix54's Larvesta

Nature: Timid Ability: Flame Body
Hidden Power: Ice 70 Location: Route 3 Date : March, 3. 2011
IVs: 31 HP | 30 Atk | 30 Def | 31 SpA | 31 SpD | 31 Spe
Avaiable as UT Level 1
Morning Sun

Kurt's Raikou


Timid
OT: Kurt
ID 56569
IV 31/3/31/31/30/31 Grass HP
EV: 6/0/0/252/0/252
AR Cloned by me
 

Christian

Veni, vidi, vici
is a Top Social Media Contributor Alumnusis a Community Contributor Alumnus
CMT for

Heal Ball
Ability: Mummy | Nature: Bold
IVs: 31 | 31 | 31 | 30 | 31 | 31 [HP 70]
Moves: Disable, Haze, Night Shade, Hex
Available at: Level 20 UT
From Cecil's First Giveaway
Fully Redis
AR Cloned by me

Is any of the DW eevolutions female?

Also, Can you tell me the nature and ability of this minccino and if it's caught?


OT:Mat
ID: 30160
IV: 31 / 31 / 31 / 31 / 31 / 31
 
In response to second CMT:
Sigilyph

Male Lv.100 Shiny
Timid Magic Guard
Flame Orb
OT: Jim ID: 42521
IV: 31/31/31/31/31/23
EV: 252 HP/ 200 DEF/ 56 Speed
Moveset: Cosmic Power, Stored Power, Roost, Psyshock
AR Cloned by me
 
Eminem's
HP ICE Shaymins
HP FIRE Shaymins
Oblivia Speed Deoxys
Oblivia Defend Deoxys
Oblivia Assault Deoxys
Fal2010 MEW
-Obtained
 
hi delagacii see ur private msg's, i answered u there also if u need a specific heatran tell me what HP u want and nature =)
 
In response to your cmt, I'll wait for the dw carvahna to lose it's nft status, or if you have just a random female one that'll do. Also cmt for zoroark
 
CMT for:


Sæglópur's Calm Female Dream World Poliwag UT Lv 1

OT: Autumn l ID: 57769
IV's: 31 l 31 l 31 l 31 l 31 l 31
Egg Moves: Encore
Ability: Swift Swim --> Drizzle
NFT

Ifly's Dream World Ability Gligar (-> Poison Heal Gliscor!) lv 10 UT

Nature: Careful | Ability: Immunity
31 | 31 | 31 | 31 | 31 | 31 [Dark 70]
Moves: Poison Sting / Rain Dance / U-turn / Night Slash
OT: Keith [23718] | Hatch Date: April 27, 2011 | Hatched: Skyarrow Bridge
NFT
 

Christian

Veni, vidi, vici
is a Top Social Media Contributor Alumnusis a Community Contributor Alumnus
Jolly,eeveelution can't be female
Well, then CMT for Cecil's shiny heal ball bold Yamask and Jolly minccino.

EDIT Didn't see this lol

in response (Loves your Kurt Balls RNGs btw :)


#646. Kyurem (★)
OT: CHRIS | ID No.: 61025 | Gender: N/A
Nature: Timid | Ability: Pressure | Type: Dragon-Ice
Hidden Power Fire 70
IV: 30/x/30/30/31/30
EV: UT | Level: 75
Moves: Glaciate | Dragon Pulse | Imprison | Endeavor




#144. Articuno (★)(Moon Ball)
OT: CHRIS | ID No.: 29668 | Gender: N/A
Nature: Timid | Ability: Pressure | Type: Ice-Flying
Hidden Power Ground 70
IV: 31/31/31/30/30/31
EV: UT | Level: 50
Moves: AncientPower | Agility | Ice Beam | Reflect

I'll VM you when I can trade. :)

BTW do you want Articuno on a 4th gen game or 5th gen game? If you want it on your B/W let me know if you want any gen4 only moves on it.
 
CMT for and what are the redis rights?

Shiny Zoroark



OT: Alex
ID: 61657
IV: 31/31/31/30/31/31 HP Electric
EV: 6/0/0/252/0/252
AR Cloned by me


We have too many of the same pokemon. XD (I'm assuming we got them from the same place, and I know some of them we did, most of the same ones that I have aren't listed.)
 
Status
Not open for further replies.

Users Who Are Viewing This Thread (Users: 1, Guests: 2)

Top